- Location : Sairang, Mizoram State
- Client : Northeast Frontier Railway
- Status of Work : Completed
- Value of Work : 115.36 Crores
- Scope of Work : Construction of Single Line BG Tunnel no. 23 ( App. Length 1056 RM ) at Km. 43.160 to 44.356 in between station Mualkhang & Sairang in connection with construction of New Railway Line Project Bhairabi – Sairang (Mizoram) of NF Railway (Construction)
Salient Features
- Method of Tunneling : NATM
- Length of Tunnel : 1200 meters
- Underground Excavation : 78,000 Cum (App.)
- Open Excavation : 400000 Cum (App.)
- Underground Shotcrete : 18,000 Cum (App.)
- Underground Concrete : 17, 400 Cum (App.)
- Steel : 2320.00 MT (App.)