Loading...
Download Brochure

lower suktel irrigation project (spillway)

lower suktel irrigation project (spillway)
  • Balangir – Odisha
  • Odisha Construction Corporation
  • Ongoing
  • Rs 169 Crores
  • Scope of Work : Construction of Spillway – Work includes earthwork excavation, reinforcement, concrete etc in connection with Lower Suktel Irrigation Project

Salient Features

  • Span of Spillway : 224.0 meters
  • Height of Spillway : 41.0 meters
  • No of Gates : 11 Nos
  • Spillway concrete : 298000.00 Cum
  • Spillway reinforcement : 800.00 MT
  • Excavation in all jobs : 791000.00 Cum