Mizoram BG Railway Line Bridge

Location

Bridge Nos. 32,67,80 and 85 in the new BG Railway line from Bairabi to Sairang section at Mizoram.

Date of Completion

Ongoing

Value of Work

Rs.88,50,71,074

Scope of Work

Construction of sub-structure over pile foundation for Major Bridges No. 32 (4 X 30.5m Composite Girder) at Ch. 11.770 KM, construction of counterfort return wall over pile foundation between Ch. 11560 to 11760m & Ch 9550 to 9750 m and other ancillary works in between station Bairabi & Hortoki.

Scope of Work

Construction of sub-structure over pile foundation for Major Bridge No. 67 (span 10×30.5m Composite Girder) at Ch.22.667 KM, Major Bridge no. 80 (span 5×24.4, composite girder) at ch. 28.584 km & Major Bridge No. 85 (span 4×24.4m composite girder) at Ch. 29.154km including protection works and other ancillary works in between station Bairabi & Sairang in connection with the construction of new BG Railway line from Bairabi to Sairang (Mizoram).

Mizoram BG Railway Line Bridge

Sevoke Railway Tunnel Project

Arun-3 Hydroelectric Project (900 MW)

Western Railway (Indore) – Tunnel No.1

Satna-Panna New BG Line Project

Likhu-4 Hydroelectric Project

Lower Solu Hydroelectric Project (82 MW)

Lower Solu Hydroelectric Project (82 MW)

Telengiri Irrigation Project (Spillway)

Telengiri Irrigation Project (Periphery Road)

Telengiri Irrigation Project (Earth Dam)

Telengiri Irrigation Project (Canal)

RET Irrigation Project (Spillway)

Dikchu Hydroelectric Project (Dam)

North East Frontier Railway (Tunnel 12)

North East Frontier Railway (Tunnel 21-22)

North East Frontier Railway (Tunnel 23)

Rengali Left Branch Canal

Dikchu Hydroelectric Project (Tunnels)

Kalpong Hydroelectric Project

Lower Suktel Irrigation Project (Spillway)

Larji Hydroelectric Project

Lumding-Silchar Gauge Conversion Project (Tunnels 5-6)

Lumding-Silchar Gauge Conversion Project (Tunnel 7)

Lower Suktel Irrigation Project (Earth Dam)

Cheligada Irrigation Project (High Level Bridge)