Western Railway (Indore) – Tunnel No.1

Location

Pithampur, MP

Client

Western Railway

Date of Completion

September 2020

Value of Work

149 Crores

Scope of Work

Construction of single line BG Tunnel No.1 between Km 24.513 to Km 27.480, Total Length 2967m (Underground tunnel -2620m and cut & cover tunnel -347m) including earthwork in formation and protection work at approaches of tunnel portals from Km 24.460 to Km 24.513 and Km 27.600 to Km 27.480 including all other ancillary works in between stations Tihi and Pithampur in the state of Madhya Pradesh in connection with New BG Railway Line Project from Dahod to Indore of Western Railway.

Salient Features

Length of tunnel: 2967 m
Under ground excavation: 180217 cum
Open excavation:
115950 cum
Underground concrete: 82612 cum
Permanent steel support: 948 MT

Arun-3 Hydroelectric Project (900 MW)

Western Railway (Indore) – Tunnel No.1

Satna-Panna New BG Line Project

Likhu-4 Hydroelectric Project

Lower Solu Hydroelectric Project (82 MW)

Lower Solu Hydroelectric Project (82 MW)

Telengiri Irrigation Project (Spillway)

Telengiri Irrigation Project (Periphery Road)

Telengiri Irrigation Project (Earth Dam)

Telengiri Irrigation Project (Canal)

RET Irrigation Project (Spillway)

Dikchu Hydroelectric Project (Dam)

North East Frontier Railway (Tunnel 12)

North East Frontier Railway (Tunnel 21-22)

North East Frontier Railway (Tunnel 23)

Rengali Left Branch Canal

Dikchu Hydroelectric Project (Tunnels)

Kalpong Hydroelectric Project

Lower Suktel Irrigation Project (Spillway)

Larji Hydroelectric Project

Lumding-Silchar Gauge Conversion Project (Tunnels 5-6)

Lumding-Silchar Gauge Conversion Project (Tunnel 7)

Lower Suktel Irrigation Project (Earth Dam)

Cheligada Irrigation Project (High Level Bridge)