Larji Hydroelectric Project

Location

Himachal Pradesh

Client

Himachal Pradesh State Electricity Board

Date of Completion

May 2006
Duration: 48 Months

Value of Work

39.98 Crores

Scope of Work

Includes underground excavation in HRT, Intake & De-silting Chambers & Supply of aggregates including crushing.

Salient Features

  • Length of Tunnels : 4400.00 meters
  • Desilting Chambers : 200 x 16 x 27 meters – 4 Nos
  • Underground Excavation : 450000 Cum
  • Supply of Aggregates : 200000 Cum

Arun-3 Hydroelectric Project (900 MW)

Western Railway (Indore) – Tunnel No.1

Satna-Panna New BG Line Project

Likhu-4 Hydroelectric Project

Lower Solu Hydroelectric Project (82 MW)

Lower Solu Hydroelectric Project (82 MW)

Telengiri Irrigation Project (Spillway)

Telengiri Irrigation Project (Periphery Road)

Telengiri Irrigation Project (Earth Dam)

Telengiri Irrigation Project (Canal)

RET Irrigation Project (Spillway)

Dikchu Hydroelectric Project (Dam)

North East Frontier Railway (Tunnel 12)

North East Frontier Railway (Tunnel 21-22)

North East Frontier Railway (Tunnel 23)

Rengali Left Branch Canal

Dikchu Hydroelectric Project (Tunnels)

Kalpong Hydroelectric Project

Lower Suktel Irrigation Project (Spillway)

Larji Hydroelectric Project

Lumding-Silchar Gauge Conversion Project (Tunnels 5-6)

Lumding-Silchar Gauge Conversion Project (Tunnel 7)

Lower Suktel Irrigation Project (Earth Dam)

Cheligada Irrigation Project (High Level Bridge)