Kalpong Hydroelectric Project

Location

North Andaman – Andaman & Nicobar Islands

Client

NHPC

Date of Completion

February 2001
Duration: 30 Months

Value of Work

13.96 Crores

Scope of Work

Work includes excavation in soils, rock, filling of clay and rock for dam, filters, riprap, rocktoe, pitching and supply of boulder for stone crushing

Salient Features

  • Clay & Rock filling : 122000 Cum
  • Excavation in Rock & Soils : 293000 Cum
  • Project is completed with an ahead schedule of eight months which is situated 260km from the capital city.

Arun-3 Hydroelectric Project (900 MW)

Western Railway (Indore) – Tunnel No.1

Satna-Panna New BG Line Project

Likhu-4 Hydroelectric Project

Lower Solu Hydroelectric Project (82 MW)

Lower Solu Hydroelectric Project (82 MW)

Telengiri Irrigation Project (Spillway)

Telengiri Irrigation Project (Periphery Road)

Telengiri Irrigation Project (Earth Dam)

Telengiri Irrigation Project (Canal)

RET Irrigation Project (Spillway)

Dikchu Hydroelectric Project (Dam)

North East Frontier Railway (Tunnel 12)

North East Frontier Railway (Tunnel 21-22)

North East Frontier Railway (Tunnel 23)

Rengali Left Branch Canal

Dikchu Hydroelectric Project (Tunnels)

Kalpong Hydroelectric Project

Lower Suktel Irrigation Project (Spillway)

Larji Hydroelectric Project

Lumding-Silchar Gauge Conversion Project (Tunnels 5-6)

Lumding-Silchar Gauge Conversion Project (Tunnel 7)

Lower Suktel Irrigation Project (Earth Dam)

Cheligada Irrigation Project (High Level Bridge)